πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Slaton BESS

Slaton BESS is a 10.0 MW battery storage request in interconnection study in the ERCOT interconnection queue.

Queue statusIn planning
  1. PlanningQueued Jun 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Aug 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25INR0689
Grid region
ERCOT (Texas)
Developer
Prairie Dog BESS, LLC
Connection point (POI)
Station Name: Slaton Substation β€šΓ„Β’ Station Code: LPLSL β€šΓ„Β’ BUS #: 59152 β€šΓ„Β’ Transmission Level Voltage: 115 kV β€šΓ„Β’ Load/Load Transformer: SLT1 β€šΓ„Β’ Node (associated w/ load/load XFMR in NMMS): SL15
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Study phase
No MRD
Queue status
Active
Entered queue
12 June 2025
Proposed online date
August 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem