United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· WESTOnshore wind project 2005-G1
Onshore wind project 2005-G1 is a 90.0 MW onshore wind request built and operating in the West interconnection queue, connecting to WAPA Rocky Mountain Region.
Request details
- Queue ID
- 2005-G1
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA Rocky Mountain Region
- Connection point (POI)
- Fleming-Haxtun
- Technology
- Wind: 90.0 MW
- Total requested
- 90.0 MW
- Study phase
- In Service
- Queue status
- Operational
- Entered queue
- 6 January 2005
- Proposed online date
- October 2012
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem