United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Panda Temple 1

Panda Temple 1 is a 790 MW gas request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Sep 2007 (completed)
  2. ConsentedJun 2012 (completed)
  3. Construction (completed)
  4. OperatingJul 2014 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
10INR0020a
Grid region
ERCOT (Texas)
Developer
Panda Temple Power LLC
Connection point (POI)
FG_PTMPL_CT1,FG_PTMPL_CT2,FG_PTMPL_ST1
Technology
Gas: 790 MW
Total requested
790 MW
Study phase
IA
Queue status
Operational
Entered queue
5 September 2007
Agreement signed
21 June 2012
Proposed online date
August 2014
Came online
July 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem