United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Navarro Energy Ctr. II

Navarro Energy Ctr. II is a 775 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
10INR0032
Grid region
ERCOT (Texas)
Developer
Summit Navarro, LLC
Technology
Gas: 775 MW
Total requested
775 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
11 December 2007
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem