SOLAR Β· SOUTHEASTSolar project IC-635
Solar project IC-635 is a 19.8 MW solar request withdrawn in the Southeast interconnection queue, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2017 (completed)
- Withdrawn / abandonedJul 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-635
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Thomson Primary - Culpepper Lumber 46kV Line
- Technology
- Solar: 19.8 MW
- Total requested
- 19.8 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 27 April 2017
- Withdrawn
- July 2017
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem