SOLAR Β· SOUTHEASTSolar project LGE-GIS-2018-002, Daviess County
Solar project LGE-GIS-2018-002, Daviess County is a 120 MW solar request withdrawn in the Southeast interconnection queue, in Daviess County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2018-002
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- Green River Steel - Cloverport 138 kV line
- Location
- Daviess County, Kentucky
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 1 October 2018
- Proposed online date
- June 2022
Location
Marker shows the centre of Daviess County; the queue data does not give exact sites.
Other requests in Daviess County
- Solar project J2113, Daviess CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project LGE-GIS-2023-006, Daviess CountySolar + storage Β· 125 MW Β· withdrawn
- Solar project J2017, Daviess CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J2016, Daviess CountyBattery storage Β· 100 MW Β· withdrawn
- Battery storage project J2480, Daviess CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar project J2147, Daviess CountySolar Β· 56.0 MW Β· withdrawn
- Solar + storage project J3794, Daviess CountySolar + storage Β· 50.0 MW Β· withdrawn
- Solar + storage project J2820, Daviess CountySolar + storage Β· 35.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem