BATTERY STORAGE Β· ERCOT

Bexar Martinez BESS

Bexar Martinez BESS is a 10.0 MW battery storage request in interconnection study in the ERCOT interconnection queue.

Queue statusIn planning
  1. PlanningQueued Sep 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Aug 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0702
Grid region
ERCOT (Texas)
Developer
Bexar Martinez LLC
Connection point (POI)
TSP Station Name: Martinez_x000D_ TSP Station Code: C5_x000D_ Load Name / Load Transformer Name: T3_x000D_ Bus #: PTI Bus Number: 5294_x000D_ Voltage (Transmission level kV): 138_x000D_ Node (associat
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Study phase
No MRD
Queue status
Active
Entered queue
14 September 2025
Proposed online date
August 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem