United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· SOUTHEASTSolar project 427, Oktibbeha County
Solar project 427, Oktibbeha County is a 200 MW solar request withdrawn in the Southeast interconnection queue, in Oktibbeha County, Mississippi, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 427
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Oktibbeha County, Mississippi
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 27 April 2020
Location
Marker shows the centre of Oktibbeha County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Oktibbeha County
- Other project 83, Oktibbeha CountyOther Β· 608 MW Β· withdrawn
- Solar + storage project 577, Oktibbeha CountySolar + storage Β· 230 MW Β· withdrawn
- Solar project 641, Oktibbeha CountySolar Β· 69.0 MW Β· withdrawn
- Solar project 632, Oktibbeha CountySolar Β· 69.0 MW Β· withdrawn
- Battery storage project 428, Oktibbeha CountyBattery storage Β· 50.0 MW Β· withdrawn
- Other project 100, Oktibbeha CountyOther Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem