United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J410, Fayette County
Onshore wind project J410, Fayette County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Fayette County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2014 (completed)
- Withdrawn / abandonedSep 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J410
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Hazelton 345 kV substation
- Location
- Fayette County, Iowa
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 14 November 2014
- Proposed online date
- October 2016
- Withdrawn
- September 2016
Location
Marker shows the centre of Fayette County; the queue data does not give exact sites.
Other requests in Fayette County
- Onshore wind project H008, Fayette CountyOnshore wind Β· 36.0 MW Β· built
- Onshore wind project G972, Fayette CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project G985, Fayette CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J409, Fayette CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project J1467, Fayette CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project J959, Fayette CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project J1438, Fayette CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem