πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project J410, Fayette County

Onshore wind project J410, Fayette County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Fayette County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2014 (completed)
  2. Withdrawn / abandonedSep 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J410
Grid region
MISO (Midcontinent)
Connection point (POI)
Hazelton 345 kV substation
Location
Fayette County, Iowa
Technology
Wind: 300 MW
Total requested
300 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
14 November 2014
Proposed online date
October 2016
Withdrawn
September 2016

Location

Marker shows the centre of Fayette County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Fayette County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem