United States β€Ί Grid β€Ί Interconnection queues

SOLAR + STORAGE Β· WEST

Solar + storage project 2025-G2

Solar + storage project 2025-G2 is a 200 MW solar + storage request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2025-G2
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Archer - Stegall 230-kV
Technology
Solar: 200 MW Β· Battery
Total requested
200 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
14 February 2025
Proposed online date
December 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem