ONSHORE WIND Β· ERCOT

Moore Wind 1

Moore Wind 1 is a 149 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJul 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
11INR0050
Grid region
ERCOT (Texas)
Developer
Moore Wind Power, LLC
Connection point (POI)
Cottonwood (59904)
Technology
Wind: 149 MW
Total requested
149 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
20 November 2008
Agreement signed
12 July 2012
Proposed online date
June 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem