United States βΊ Grid βΊ Interconnection queues βΊ New York
GAS Β· NYISOLinden
Linden is a 1,200 MW gas request withdrawn in the NYISO interconnection queue, connecting to CONED.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2006 (completed)
- Withdrawn / abandonedNov 2006 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 226
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CONED
- Developer
- Cavallo Power
- Connection point (POI)
- East 13th, West 49th
- Location
- New York
- Technology
- Gas: 1,200 MW
- Total requested
- 1,200 MW
- Queue status
- Withdrawn
- Entered queue
- 8 September 2006
- Withdrawn
- November 2006
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem