United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

SOLAR Β· NYISO

K. High

K. High is a 19.8 MW solar request withdrawn in the NYISO interconnection queue, in Wayne County, New York, connecting to RG&E.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2020 (completed)
  2. Withdrawn / abandonedApr 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1064
Grid region
NYISO (New York)
Utility / transmission owner
RG&E
Developer
AES DE DEVCO NC LLC
Connection point (POI)
Station 218 - Station 181 34.5kV
Location
Wayne County, New York
Technology
Solar: 19.8 MW
Total requested
19.8 MW
Queue status
Withdrawn
Entered queue
31 July 2020
Withdrawn
April 2023

Location

Marker shows the centre of Wayne County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Wayne County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem