United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOK. High
K. High is a 19.8 MW solar request withdrawn in the NYISO interconnection queue, in Wayne County, New York, connecting to RG&E.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2020 (completed)
- Withdrawn / abandonedApr 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1064
- Grid region
- NYISO (New York)
- Utility / transmission owner
- RG&E
- Developer
- AES DE DEVCO NC LLC
- Connection point (POI)
- Station 218 - Station 181 34.5kV
- Location
- Wayne County, New York
- Technology
- Solar: 19.8 MW
- Total requested
- 19.8 MW
- Queue status
- Withdrawn
- Entered queue
- 31 July 2020
- Withdrawn
- April 2023
Location
Marker shows the centre of Wayne County; the queue data does not give exact sites.
Other requests in Wayne County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem