United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project G0672, Benton County

Solar + storage project G0672, Benton County is a 400 MW solar + storage request withdrawn in the West interconnection queue, in Benton County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0672
Grid region
West (non-ISO utilities)
Connection point (POI)
Midway - Grandview 115 kV
Location
Benton County, Washington
Technology
Solar: 200 MW Β· Battery: 200 MW
Total requested
400 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
5 March 2021
Proposed online date
October 2024

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem