πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Bay Prairie Solar

Bay Prairie Solar is a 201 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0156
Grid region
ERCOT (Texas)
Developer
San Bernard Solar II, LLC
Connection point (POI)
CenterPoint South Lane City 43190 138kV
Technology
Solar: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 October 2022
Proposed online date
September 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem