COAL Β· ERCOT

Sandow 5

Sandow 5 is a 430 MW coal request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
08INR0002
Grid region
ERCOT (Texas)
Developer
Genova Power
Technology
Coal: 430 MW
Total requested
430 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
25 September 2003
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem