United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J2620, Ouachita County
Solar project J2620, Ouachita County is a 164 MW solar request withdrawn in the MISO interconnection queue, in Ouachita County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2620
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- Bearden to Camden North 115 kV
- Location
- Ouachita County, Arkansas
- Technology
- Solar: 164 MW
- Total requested
- 164 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- June 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Ouachita County; the queue data does not give exact sites.
Other requests in Ouachita County
- Solar project J2865, Ouachita CountySolar Β· 375 MW Β· in study
- Solar project J3040, Ouachita CountySolar Β· 365 MW Β· in study
- Solar + storage project J4134, Ouachita CountySolar + storage Β· 200 MW Β· in study
- Solar + storage project J2818, Ouachita CountySolar + storage Β· 130 MW Β· in study
- Solar project J2634, Ouachita CountySolar Β· 106 MW Β· in study
- Battery storage project J3164, Ouachita CountyBattery storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem