United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTRose Capital Solar
Rose Capital Solar is a 205 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 28INR0284
- Grid region
- ERCOT (Texas)
- Developer
- ACE DevCo NC, LLC
- Connection point (POI)
- The point of interconnection is the 345-kV Martin Lake (PSSE #3100) to Shamburger Switch (PSSE#3103) transmission line.
- Technology
- Solar: 205 MW
- Total requested
- 205 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Proposed online date
- May 2028
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem