πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Rose Capital Solar

Rose Capital Solar is a 205 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28INR0284
Grid region
ERCOT (Texas)
Developer
ACE DevCo NC, LLC
Connection point (POI)
The point of interconnection is the 345-kV Martin Lake (PSSE #3100) to Shamburger Switch (PSSE#3103) transmission line.
Technology
Solar: 205 MW
Total requested
205 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
May 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in