United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project G0647, Benton County

Solar + storage project G0647, Benton County is a 560 MW solar + storage request withdrawn in the West interconnection queue, in Benton County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0647
Grid region
West (non-ISO utilities)
Connection point (POI)
Wautoma 500 kV Switchyard
Location
Benton County, Washington
Technology
Solar: 360 MW Β· Battery: 200 MW
Total requested
560 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
18 May 2020
Proposed online date
December 2023

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem