United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

SOLAR + STORAGE Β· SOUTHEAST

Solar + storage project LGE-GIS-2024-001, Grayson County

Solar + storage project LGE-GIS-2024-001, Grayson County is a 75.0 MW solar + storage request withdrawn in the Southeast interconnection queue, in Grayson County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LGE-GIS-2024-001
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Louisville Gas & Electric and Kentucky Utilities Energy
Connection point (POI)
Ohio Coβ€šΓ„Γ¬Leitchfield 69 kV Line
Location
Grayson County, Kentucky
Technology
Solar: 75.0 MW Β· Battery
Total requested
75.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
23 January 2024
Proposed online date
December 2027

Location

Marker shows the centre of Grayson County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Grayson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem