United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESHydro interconnection queue in the USA (2022 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hydro project 437, Cascade County Hydro |
70.0 MW | In study |
| Hydro project 570430, Montgomery County Hydro Β· Duke Energy Progress, LLC |
6.3 MW | Under construction |
| Hydro project J1826, Dakota County Hydro |
4.0 MW | In study |
| Hydro project J3219, Dakota County Hydro |
3.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1 Β· 70.0 MW
- MISO (Midcontinent)2 Β· 7.0 MW
- Southeast (non-ISO utilities)1 Β· 6.3 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)