United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Hydro interconnection queue in the USA (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3646 MW
Active in queue646 MW3 requests
Agreement signed0.5 MW1 requests
Withdrawn13812 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project G0490, Douglas County
Hydro
345 MWIn study Douglas, WAWest Jul 2013target 2022
Dworshak Fourth Unit
Hydro
300 MWIn study Clearwater, IDWest Aug 2013target 2019
Lassen Lodge Hydroelectric 2
Hydro
0.5 MWAgreement signed Tehama, CACAISO Apr 2013target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)