United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Coal interconnection queue in the USA (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown277.0 MW
Active in queue77.0 MW2 requests
Agreement signed0.0 MW0 requests
Withdrawn32,011 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Coal project 12-047, Morrow County
Coal
44.0 MWPaused / redesign Morrow, ORWest Feb 2012target 2012
Coal project GI-48, Randolph County
Coal
33.0 MWIn study Randolph, MOSoutheast Oct 2012target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)