πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Wyoming (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown72,338 MW
Active in queue2,338 MW7 requests
Agreement signed790 MW2 requests
Withdrawn112,818 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project C1-35, Carbon County
Onshore wind Β· Lucky Star Wind, LLC
500 MWAgreement signed Carbon, WYWest May 2021target 2028
Solar + storage project GI-DISIS-2021-10, Converse County
Solar + storage
398 MWPaused / redesign Converse, WYWest May 2021target 2023
Onshore wind project 21-08242, Laramie County
Onshore wind
350 MWIn study Laramie, WYWest Aug 2021target 2025
Other project 607, Sweetwater County
Other Β· NextEra Energy Resources Interconnection Holdings, LLC
300 MWPaused / redesign Sweetwater, WYWest Jun 2021target 2025
Other project 608, Sweetwater County
Other Β· NextEra Energy Resources Interconnection Holdings, LLC
300 MWPaused / redesign Sweetwater, WYWest Jun 2021target 2025
Onshore wind project BHBE G16, Campbell County
Onshore wind
290 MWAgreement signed Campbell, WYWest Dec 2021target 2024
Other project 609, Sweetwater County
Other Β· NextEra Energy Resources Interconnection Holdings, LLC
200 MWPaused / redesign Sweetwater, WYWest Jun 2021target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)