Withdrawn queue requests in Wyoming (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown43,422 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn43,422 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Pathfinder Renewable Wind Energy
Onshore wind
3,000 MWWithdrawn / abandoned Platte, WYCAISO Mar 2011target 2020
Onshore wind project 375, Carbon County
Onshore wind
230 MWWithdrawn / abandoned Carbon, WYWest Mar 2011target 2014
Gas project CLPT-G3, Laramie County
Gas
100 MWWithdrawn / abandoned Laramie, WYWest Jul 2011target 2014
Onshore wind project 402, Albany County
Onshore wind
92.0 MWWithdrawn / abandoned Albany, WYWest Oct 2011target 2018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)