United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Wyoming (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51,548 MW
Active in queue2,338 MW7 requests
Agreement signed790 MW2 requests
Withdrawn112,818 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project GI-DISIS-2021-10, Converse County
Solar + storage
398 MWPaused / redesign Converse, WYWest May 2021target 2023
Onshore wind project 21-08242, Laramie County
Onshore wind
350 MWIn study Laramie, WYWest Aug 2021target 2025
Other project 607, Sweetwater County
Other Β· NextEra Energy Resources Interconnection Holdings, LLC
300 MWPaused / redesign Sweetwater, WYWest Jun 2021target 2025
Other project 608, Sweetwater County
Other Β· NextEra Energy Resources Interconnection Holdings, LLC
300 MWPaused / redesign Sweetwater, WYWest Jun 2021target 2025
Other project 609, Sweetwater County
Other Β· NextEra Energy Resources Interconnection Holdings, LLC
200 MWPaused / redesign Sweetwater, WYWest Jun 2021target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)