United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in West Virginia (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown360.8 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn360.8 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project Y1-016, Hardy County
Onshore wind
50.0 MWWithdrawn / abandoned Hardy, WVPJM Feb 2012target 2015
Purdys Run Plant
Gas
6.0 MWWithdrawn / abandoned Harrison, WVPJM Feb 2012target 2015
Other project Y1-013, Harrison County
Other
4.8 MWWithdrawn / abandoned Harrison, WVPJM Feb 2012target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)