Completed queue projects in West Virginia (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown355.8 MW
Active in queue586 MW2 requests
Agreement signed586 MW2 requests
Withdrawn7877 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Beech Ridge Wind Farm
Onshore wind
50.6 MWOperating Greenbrier, WVPJM Oct 20152020
Seven Islands Environmental Solutions, LLC
Other
3.2 MWOperating WVPJM Oct 20152017
Balls Gap Battery Facility
Battery storage
2.0 MWOperating Cabell, WVPJM Aug 20152017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)