OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Washington (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4133 MW
Active in queue345 MW1 requests
Agreement signed0.0 MW0 requests
Withdrawn4133 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project G0496, Pend Oreille County
Hydro
70.0 MWWithdrawn / abandoned Pend Oreille, WAWest Dec 2013target 2014
Gas project G0495, Clark County
Gas
60.0 MWWithdrawn / abandoned Clark, WAWest Dec 2013target 2016
Other project G0483, Skamania County
Other
2.0 MWWithdrawn / abandoned Skamania, WAWest May 2013target 2014
Hydro project G0482, Lewis County
Hydro
1.0 MWWithdrawn / abandoned Lewis, WAWest Apr 2013target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)