OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Washington (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown316.0 MW
Active in queue2,440 MW12 requests
Agreement signed430 MW3 requests
Withdrawn255,228 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 91, King County
Hydro
6.5 MWOperating King, WAWest Dec 2020
Hydro project 92, King County
Hydro
6.5 MWOperating King, WAWest Dec 2020
Qualco Project
Other
3.0 MWOperating Snohomish, WAWest Oct 2020target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)