Completed queue projects in Washington (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown32.1 MW
Active in queue3,657 MW22 requests
Agreement signed430 MW5 requests
Withdrawn494,360 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Arlington Microgrid
Solar + storage
1.0 MWOperating Snohomish, WAWest Jun 2018target 2019
Decatur Island Solar
Solar
1.0 MWOperating San Juan, WAWest Apr 2018target 2018
Battery storage project 74, Lincoln County
Battery storage
0.1 MWOperating Lincoln, WAWest Nov 2018target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)