United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Washington (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown411.0 MW
Active in queue345 MW1 requests
Agreement signed0.0 MW0 requests
Withdrawn4133 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 39, Spokane County
Hydro
7.6 MWOperating Spokane, WAWest Jul 2013target 2015
Battery storage project G0481, Snohomish County
Battery storage
2.0 MWOperating Snohomish, WAWest Apr 2013target 2013
Hardeson Battery Storage
Battery storage
1.0 MWOperating Snohomish, WAWest May 2013target 2014
Hydro project 38, Adams County
Hydro
0.4 MWOperating Adams, WAWest Mar 2013target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)