United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Virginia (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6630 MW
Active in queue630 MW6 requests
Agreement signed630 MW6 requests
Withdrawn527,174 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Chickahominy Solar 1 and 2
Solar
320 MWAgreement signed Charles City, VAPJM Oct 20162021
Greenwood Solar
Solar
100 MWAgreement signed Culpeper, VAPJM Aug 2016target 2027
Springfield Solar
Solar
80.0 MWAgreement signed Hanover, VAPJM Oct 2016target 2027
Cricket Solar
Solar
60.0 MWAgreement signed Culpeper, VAPJM Oct 2016target 2029
Walnut Solar I
Solar
50.0 MWAgreement signed King And Queen, VAPJM Sep 2016target 2026
Cricket Solar
Solar
20.0 MWAgreement signed Culpeper, VAPJM Oct 2016target 2029

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)