Completed queue projects in Virginia (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8291 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn25596 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Newsoms Solar
Solar
100 MWOperating Southampton, VAPJM Mar 20152017
Gas project AB1-181, Fluvanna County
Gas
37.3 MWOperating Fluvanna, VAPJM Oct 20152017
Smith Mountain Hydro
Hydro
34.0 MWOperating Henry, VAPJM Feb 20152018
Bear Garden Facility
Gas
32.2 MWOperating Buckingham, VAPJM Apr 20152016
Possum Point Unit 6
Gas
28.0 MWOperating Prince William, VAPJM Mar 20152016
Mechanicsville Solar
Solar
20.0 MWOperating Hanover, VAPJM Jul 20152020
Meherrin Solar
Solar
19.8 MWOperating Greensville, VAPJM Oct 20152022
Meherrin Solar
Solar
19.8 MWOperating Greensville, VAPJM Oct 20152022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)