United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Utah (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown53.8 MW
Active in queue420 MW3 requests
Agreement signed75.0 MW1 requests
Withdrawn385,142 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 852, Tooele County
Battery storage Β· Tooele Army Depot
1.0 MWOperating Tooele, UTWest Mar 2017target 2018
Battery storage project 919, Garfield County
Battery storage Β· PacifiCorp Energy Supply Management
1.0 MWOperating Garfield, UTWest Jul 2017target 2020
Solar project 918, Garfield County
Solar Β· PacifiCorp Energy Supply Management
0.7 MWOperating Garfield, UTWest Jul 2017target 2020
Gas project 954, Salt Lake County
Gas Β· LBISat, LLC
0.7 MWOperating Salt Lake, UTWest Sep 2017target 2017
Solar project 889, Salt Lake County
Solar Β· Oracle America, Inc.
0.4 MWOperating Salt Lake, UTWest Jun 2017target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)