Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown260.6 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn91,013 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 384, San Juan County
Onshore wind Β· Latigo Wind Park, LLC
60.0 MWOperating San Juan, UTWest Mar 2011target 2015
Solar project 396, Salt Lake County
Solar Β· eBay, Inc.
0.6 MWOperating Salt Lake, UTWest Aug 2011target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)