United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Texas (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2137 MW
Active in queue116.3 GW402 requests
Agreement signed4,428 MW22 requests
Withdrawn164,201 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
V2 Brooks Field DGR
Other Β· Life Cycle Power
76.5 MWOperating Bexar, TXERCOT Jun 20252025
Z0 Beck Road DGR
Other Β· Life Cycle Power
60.0 MWOperating Bexar, TXERCOT Jun 20252025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)