πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Tennessee

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Tennessee (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6632 MW
Active in queue30.0 MW1 requests
Agreement signed30.0 MW1 requests
Withdrawn6632 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 353, Fayette County
Solar
340 MWWithdrawn / abandoned Fayette, TNSoutheast Jun 2018
Solar project 340, Carroll County
Solar
68.0 MWWithdrawn / abandoned Carroll, TNSoutheast Mar 2018
Solar project 338, Lake County
Solar
68.0 MWWithdrawn / abandoned Lake, TNSoutheast Jan 2018
Solar project 345, Shelby County
Solar
66.0 MWWithdrawn / abandoned Shelby, TNSoutheast Apr 2018
Solar project 346, Fayette County
Solar
50.0 MWWithdrawn / abandoned Fayette, TNSoutheast Apr 2018
Solar project 352, Fayette County
Solar
40.0 MWWithdrawn / abandoned Fayette, TNSoutheast Jun 2018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)