United States βΊ Grid βΊ Interconnection queues βΊ Tennessee
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Tennessee (2016 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 298, Haywood County Solar |
400 MW | Withdrawn / abandoned |
| Solar project 284, Carroll County Solar |
75.0 MW | Withdrawn / abandoned |
| Solar project 278, Henry County Solar |
75.0 MW | Withdrawn / abandoned |
| Solar project 294, Haywood County Solar |
67.0 MW | Withdrawn / abandoned |
| Solar project 281, Benton County Solar |
66.0 MW | Withdrawn / abandoned |
| Solar project 303, Roane County Solar |
29.0 MW | Withdrawn / abandoned |
| Solar project 306, Shelby County Solar |
8.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)