πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in South Dakota (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3150 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn3541 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 165, Bon Homme County
Onshore wind
130 MWOperating Bon Homme, SDWest Oct 20132014
Onshore wind project GI-1309, Clark County
Onshore wind Β· Oak Tree Energy, LLC
19.5 MWOperating Clark, SDWest Aug 2013target 2014
Other project 166, Jerauld County
Other
0.5 MWOperating Jerauld, SDWest Oct 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)