Completed queue projects in South Carolina (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9602 MW
Active in queue69.8 MW1 requests
Agreement signed69.8 MW1 requests
Withdrawn362,127 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 45, Aiken County
Solar
75.0 MWOperating Aiken, SCSoutheast Sep 2017target 2019
Solar project 46, Georgetown County
Solar
75.0 MWOperating Georgetown, SCSoutheast Sep 2017target 2019
Solar project 47, Georgetown County
Solar
75.0 MWOperating Georgetown, SCSoutheast Sep 2017target 2019
Solar project 62, Lexington County
Solar Β· Allora
75.0 MWOperating Lexington, SCSoutheast Nov 2017target 2019
Solar project 54, Lexington County
Solar Β· Gunsight
75.0 MWOperating Lexington, SCSoutheast Nov 2017target 2019
Solar project 48, Horry County
Solar
75.0 MWOperating Horry, SCSoutheast Sep 2017target 2019
Solar project 44, Jasper County
Solar
75.0 MWOperating Jasper, SCSoutheast Aug 2017target 2019
Solar project 63, Chesterfield County
Solar Β· Centerfield
75.0 MWOperating Chesterfield, SCSoutheast Nov 2017target 2019
Solar project 16227, Darlington County
Solar
2.0 MWOperating Darlington, SCSoutheast Aug 20172023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)