United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Queue projects under construction in South Carolina (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3224 MW
Active in queue4,533 MW40 requests
Agreement signed0.0 MW0 requests
Withdrawn695,046 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project PP00002, Darlington County
Solar
74.9 MWUnder construction Darlington, SCSoutheast Sep 2024target 2026
Solar project PP00003, Chesterfield County
Solar
74.9 MWUnder construction Chesterfield, SCSoutheast Sep 2024target 2027
Solar project PP00001, Darlington County
Solar
74.2 MWUnder construction Darlington, SCSoutheast Sep 2024target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)