πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Pennsylvania (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7288 MW
Active in queue44.0 MW1 requests
Agreement signed44.0 MW1 requests
Withdrawn193,018 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Smithton Generation Station
Gas
110 MWOperating Westmoreland, PAPJM Jul 20162018
CPV Fairview Energy Center
Gas
100 MWOperating Cambria, PAPJM Oct 20162019
Birdsboro Power LLC Generation Facility
Gas
35.0 MWOperating Berks, PAPJM Apr 20162019
Helix Ironwood Facility
Gas
30.0 MWOperating Lebanon, PAPJM Aug 20162018
PA Solar Park
Solar
10.0 MWOperating Carbon, PAPJM Oct 20162020
State College Pumping Station Battery
Battery storage
1.5 MWOperating Centre, PAPJM Jul 20162019
Route 16 (Mountain View) 345kV (Upton 114)
Other
1.1 MWOperating Franklin, PAPJM Sep 20162017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)