Requests shown72,431 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn414,132 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Patriot Generating Station
Gas
850 MWOperating Lycoming, PAPJM May 20112016
Liberty/Asylum Township Plant
Gas
850 MWOperating Bradford, PAPJM Apr 20112016
Sunbury Generation Facility
Gas
416 MWOperating Snyder, PAPJM May 20112018
Sunbury Generation Facility
Gas
227 MWOperating Snyder, PAPJM Nov 20112018
Phillips Island CT1, CT2,CT3 & ST4
Gas
35.0 MWOperating Delaware, PAPJM Dec 20112018
Lower Mount Bethel
Gas
33.0 MWOperating Northampton, PAPJM Apr 20112012
Mehoopany Plant
Gas
20.0 MWOperating Wyoming, PAPJM Aug 20112013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)