United States β€Ί Grid β€Ί Interconnection queues β€Ί Oregon

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Oregon (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown542.0 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn211,051 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 413, Malheur County
Solar
10.0 MWOperating Malheur, ORWest Oct 2013target 2014
Solar project 412, Malheur County
Solar
10.0 MWOperating Malheur, ORWest Oct 2013target 2014
Solar project 419, Malheur County
Solar
9.0 MWOperating Malheur, ORWest Nov 2013target 2016
Columbia Ridge Landfill Expansion
Other Β· WM Renewable Energy, LLC
7.0 MWOperating Gilliam, ORWest Jul 2013target 2014
Solar project 414, Malheur County
Solar
6.0 MWOperating Malheur, ORWest Oct 2013target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)