Projects with signed interconnection agreements in Oregon (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3360 MW
Active in queue535 MW8 requests
Agreement signed360 MW3 requests
Withdrawn643,433 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 17-067, Multnomah County
Battery storage
200 MWAgreement signed Multnomah, ORWest Sep 2017target 2031
Solar + storage project 907, Klamath County
Solar + storage Β· Fresh Air Energy II, LLC
80.0 MWAgreement signed Klamath, ORWest Jul 2017target 2030
Solar + storage project 906, Klamath County
Solar + storage Β· Fresh Air Energy II, LLC
80.0 MWAgreement signed Klamath, ORWest Jul 2017target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)