United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Oklahoma (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown41,084 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn81,178 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project GEN-2013-028, Mayes County
Gas
538 MWOperating Mayes, OKSPP Sep 20132017
Onshore wind project GEN-2013-029, Grant County
Onshore wind
299 MWOperating Grant, OKSPP Sep 20132016
Gas project GEN-2013-012, Logan County
Gas
147 MWOperating Logan, OKSPP Mar 20132014
Onshore wind project GEN-2013-007, Murray County
Onshore wind
100 MWOperating Murray, OKSPP Mar 20132015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)