United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Oklahoma (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6824 MW
Active in queue341 MW2 requests
Agreement signed341 MW2 requests
Withdrawn142,410 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GEN-2011-054, Canadian County
Onshore wind
300 MWOperating Canadian, OKSPP Sep 20112014
Onshore wind project GEN-2011-014, Beaver County
Onshore wind
198 MWOperating Beaver, OKSPP Mar 20112016
Onshore wind project GEN-2011-040, Murray County
Onshore wind
111 MWOperating Murray, OKSPP Sep 20112014
Onshore wind project GEN-2011-050, Grady County
Onshore wind
108 MWOperating Grady, OKSPP Sep 20112016
Onshore wind project GEN-2011-010, Caddo County
Onshore wind
101 MWOperating Caddo, OKSPP Mar 20112012
Onshore wind project GEN-2011-037, Caddo County
Onshore wind
6.6 MWOperating Caddo, OKSPP Jul 20112013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)