πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in North Carolina (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7974 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn7974 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hales Lake Energy Center
Onshore wind
300 MWWithdrawn / abandoned Camden, NCPJM Sep 2010target 2016
Onshore wind project W3-053, Washington County
Onshore wind
260 MWWithdrawn / abandoned Washington, NCPJM Aug 2010target 2013
Onshore wind project W3-019, Currituck County
Onshore wind
150 MWWithdrawn / abandoned Currituck, NCPJM Aug 2010target 2013
Onshore wind project W3-054, Tyrrell County
Onshore wind
150 MWWithdrawn / abandoned Tyrrell, NCPJM Aug 2010target 2013
Pantego Wind Farm
Onshore wind
73.6 MWWithdrawn / abandoned Hyde, NCPJM May 2010target 2018
Solar project W3-050, Bertie County
Solar
20.0 MWWithdrawn / abandoned Bertie, NCPJM Aug 2010target 2012
Solar project W1-057, Hertford County
Solar
20.0 MWWithdrawn / abandoned Hertford, NCPJM Mar 2010target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)