Queue requests in study in North Carolina (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7739 MW
Active in queue2,105 MW26 requests
Agreement signed999 MW12 requests
Withdrawn543,841 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 923973, Richmond County
Solar Β· Masked
275 MWIn study Richmond, NCSoutheast Sep 2023
Battery storage project 898997, Rutherford County
Battery storage
200 MWIn study Rutherford, NCSoutheast Jun 2023
Solar project 919393, Wake County
Solar Β· Duke Energy Progress, LLC
100 MWIn study Wake, NCSoutheast Sep 2023
Solar project 915751, Granville County
Solar
80.0 MWIn study Granville, NCSoutheast Sep 2023
Solar project 920663, Randolph County
Solar
44.0 MWIn study Randolph, NCSoutheast Sep 2023
Gas project 900845, Buncombe County
Gas Β· Duke Energy Progress, LLC
19.9 MWIn study Buncombe, NCSoutheast Jun 2023target 2025
Gas project 900843, Buncombe County
Gas Β· Duke Energy Progress, LLC
19.9 MWIn study Buncombe, NCSoutheast Jun 2023target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)